Creative Composites: ENERGY CASE STUDY
£47,628 SAVED & Enhanced Energy Efficiency
Background
Creative Composites is a global manufacturer of composite materials, they operated two fiberglass press machines, both vital to their production line but significantly differing in efficiency and operating costs.
The challenge
The existing infrastructure included two fiberglass press machines, with Machine 1 upgraded for efficiency but Machine 2 operating at a significantly higher energy cost of £35,628.00 per annum and yielding 25% less throughput. The client faced escalating energy costs and lacked real-time monitoring, leading to inefficiencies and increased operational expenses."
How
Discover how Creative Composites, a leader in the production of composite material, faced a significant challenge in managing energy consumption within their factory.

Solution
We implemented an energy management system to monitor main electricity supplies and significant energy users, this provided real-time energy usage analytics, enabling proactive adjustments.
Implementation
The project commenced with a comprehensive energy audit, followed by a installation of cloud based energy management system, ensuring minimal disruption to daily operations.
results
The successful implementation of energy-conservation measures yielded an estimated annual savings of approximately £47,628.00. The energy management system continues to serve as a vital tool for monitoring the performance of significant power users within the facility.
Ready to start saving? Receive a callback
contact us
Find us Here
Saint Cunning
49 Drumnagreagh Road
Ballygalley
Larne
BT40 2RP
Get In touch
Business Hours
Monday - Friday
9am- 5pm
Take control of your energy consumption and lower costs today. Our expert team will analyze your energy use and provide a tailored efficiency plan.
