Case Studies

METHODIST CHURCH

Customer brief: To improve the cost efficiency and effectiveness of the church heating.


Gentle heat for comfortable gatherings

Background

This Methodist Church had three 4 kW electric convector heaters that were proving to be inefficient in heating the public space.

Solution

  • The existing three convector heaters were removed and replaced with two 0.89 kW infrared heaters
  • Picture panels were installed.

Results

  • Easy installation
  • Improved efficiency and lower running costs
  • Picture panels were personalised to allow the Church to use the heaters for Church messages.

Application